Inspections | Status | Scheduled Date | Actions |
---|---|---|---|
600 (Final Inspection) | Approved | 9/22/2022 | Details |
475 (Aboveground Sprinkler Visual) | Approved | 9/15/2022 | Details |
480 (Aboveground Hydro-Sprinkler Inspection) | Approved | 5/31/2022 | Details |
485 (Sprinkler System Alteration Inspection) | Cancelled | 3/17/2022 | DetailsSchedule |